Which of the following is a Rule for material handling?
Make handling distances as short as possible
Use right method and proper material handling
Eliminate wasteful material handling methods
all of these
200 practice sets · Page 4 of 10
Which of the following is a Rule for material handling?
Make handling distances as short as possible
Use right method and proper material handling
Eliminate wasteful material handling methods
all of these
...............is a graphical tool to analyse and time the small, physical actions of workers and machine in performing a routine, repetitive, worker- machine task so that idle time can be identified
Activity chart
Metrics
a and b
None of these
Which of the following is not aRule for material handling?
Make handling distances as short as possible
Use right method and proper material handling
Promote wasteful material handling methods
Use mechanical equipments wherever it is useful
This cost is the costs resulting from products or services not conforming to requirements or user needs.
Prevention cost
appraisal cost
Failure cost
None of the above
Which of the following is not an Objective of material handling?
To reduce material handling cost
To increase production life cycle
Better control of the flow of material
To ensure safety in the movement of goods
This cost is the cost associated with measuring evaluating, or auditing products or services to assure conformance to quality standards and performance requirements
Prevention cost
Appraisal cost
Failure cost
None of the above
Which of the following is not an objective of MRP?
Reduction in inventory cost
Meeting delivery schedule
Improve the performance of production
To decrease production efficiency
The costs of all activities incurred to prevent poor quality in products and services.
Prevention cost
Appraisal cost
Failure cost
None of the above
Which of the following is not anobjective of good plant layout?
To improve productivity
To provide safety to employees
Toincrease the number of accidents
to provide easy supervision
...............is the systematic recording and critical examination of existing and the proposed way of doing work as a means of developing effective methods.
Method study
Time study
Time booking
None of these
Which of the following is not a quality of good plant layout?
To reduce material handling cost
To provide enough production facility
To reduce labour efficiency
To provide ease of supervision
Which of the following is not a principles of TQM?
Customer focus
Continuous improvement
Team approach
Black marketing
Which of the following is not an objective of quality circle?
To improve quality
To improve productivity
Trading on equity
None of these
Which of the following is not a limitation of multi-story building?
Materials handling becomes very complicated
A lot of floor space is wasted on elevators stairways and fire escapes
Natural lighting is poor
Less land is required
Which of the following is not an advantage of single story building?
There is a greater flexibility in layout
Expansion is easily ensured by the removal of walls
low cost of transportation and material handling charges
More land is required for building construction
...............is a group of workers from the same area who usually meet to discuss their problems, investigate, recommend solutions and to corrective actions
Quality problems
Quality circle
Quantify value
None of these
Industrial buildings may be grouped under
Single-storey buildings
Multi-storey buildings
a and b
None of these
In management literature TQM stands for
Total quality management
Total quantity management
Total quantity maintenance
None of these
Which of the following is not a control chart for attributes?
P chart
C chart
X chart
None of these
Locating the plant nearer to the market is preferred if:
The products are subject to spoilage
After sales services are promptly required very often
a and b
None of these