A building line is
the line in front of which no building is allowed
part of a bricklayers tool kit
the datum line of a building
a line seen through the eyepiece of a surveyors level
Browse topic-based Civil and Mechanical Engineering practice sets.
1131 practice sets · Page 47 of 57
A building line is
the line in front of which no building is allowed
part of a bricklayers tool kit
the datum line of a building
a line seen through the eyepiece of a surveyors level
A brick scutch should be used to
adjust quoin bricks
cut small bevelled bats
cut perforated bricks
trim rough-cut bricks
The word ceramic meant for
soft material
hard material
burnt material
dry material
The following ceramic product is mostly used as pigment in paints
Not a major contributor of engineering ceramics
SiC
Not a characteristic property of ceramic material
high temperature stability
high mechanical strength
low elongation
low hardness
Most commercial glasses consist of
lime
soda
silica
all of the above
Major ingredients of traditional ceramics
silica
clay
feldspar
all
Hot isostatic pressing is not a viable option if the chief criterion is
strength without grain growth
lost cost
zero porosity
processing refractory ceramics
During sintering densification is not due to
atomic diffusion
surface diffusion
bulk diffusion
grain growth
.................is the part of building constructed above the plinth level.
Superstructure
Substructure
Foundation
Plinth
.................is the unit of measurement of intensity of light?
1 lux – 5luman/m2
1 lux – 1luman/m2
1 lux – 10luman/m2
2 lux – 6luman/m2
................consists of driving either a hollow tube or a steel rod or an iron rod into the ground.
Trail pits
Test piles
Probing
Digging
...............consist of a vibrating unit mounted on a screed, plate or roller.
Earth rammers
Pounding
Vibrating rollers
Vibratory compactors
..............are the most commonly used equipment for transportation.
Dump trucks
Rollers
Trucks
Bulldozers
..............is a process of connecting cables & wires to the related devices such as fuse switches, lights, fans etc to the main distribution board for continuous power supply.
Electric wiring
Water supply
Both a and b are correct
Both a and b are not correct
..............is a wooden material made artifically from solid wastes like sawdust, flyash and other biodegradable wastes etc.
Artifical Timber
Wall Cladding
Acoustic Material
None of the above
..............is the practice of assembling components of a structure in a factory or other manufacturing site, and transporting complete assemblies or sub-assemblies to the construction site where the structure is to be located.
fabrication
Prefabrication
Damping
Scaffolding
..............is the process in which we cover the structural members of a building to increase the strength of the building.
Jacketing
scaffoldings
Shoring
Sesmic Retrofitting
.............are structural members design to carry and transfer transverse loads across space to support elements.
Beams
Columns
Lintels
Sills