A...............can be used on wet ground and in all conditions of weather.
Grader
Scraper
Escalator
Bulldozer
126 practice sets · Page 2 of 7
A...............can be used on wet ground and in all conditions of weather.
Grader
Scraper
Escalator
Bulldozer
A.............is very useful equipment and it can be used for construction work like to clear the site of work, to make the land level, etc.
Scraper
Grader
Excavator
Bulldozer
A.............usually parallel to the plot boundaries and laid down in each case by the Authority, beyond which nothing can be constructed towards the site boundaries.
Building line
Control line
Property line
Plot line
A............roller is a multi purpose roller which is used for various purposes and for practically all type of roads.
Smooth wheeled
Pneumatic
Rubber tyred
Dead weight
According to the Indian Standard recommendations, a water requirement of how many litres per head per day is assumed for residential buildings.
50 litres
115 litres
135 litres
160 litres
As per IS :1172-1963, water required per head per day for average domestic purposes is
20litres
50 litres
135 litres
80litres
At 28 days of curing concrete attains a strength of
20 to 25%
60 to 70%
65 to 80%
90 to 95%
Choose which one is correct.
YC fuse
IC fuse
TC fuse
AC fuse
Disasters can be broadly termed as.........types.
2
4
5
3
Disinfection of drinking water is done to remove
Odour
Bacterias
Turbidity
Colour
Due to improper ventilation, which gas gets stuck into house and develops dizziness to the occupants.
Oxygen
Nitrogen
Carbon dioxide
Hydrogen
Earth embankments or slopes are commonly required for which of the following purpose?
Railways
Earth dams
Road ways
All of the above
Earthquake force is a function of
Mass
Thickness
Length
Breadth
Earthquakes occur at which portion of plates?
Middle portion
Along the boundaries of plates
Along the equidistant lines of plates
At the centre point of the plates
Effective compaction is not achieved by
Rubber tyred
Sheeps foot
Pneumatic
Smooth wheeled
FRP stands for:
Fibre Reinforced Polymer
Fully Reinforced Polymer
Fire Resistant Polymer
Fibre Reconditioned Polymer
Full form of PVC is
Polyethenevinyl chloride
Polyethylvinyl chloride
Polyvinyl chloride
Polymethylvinyl chloride
Geosynthetics includes how main product categories.
8
9
10
6
How many steps are involved in a soil investigation?
6
5
2
3
How many types of bands are there?
10
5
4
8