Which of the following is used for issuing materials to different production departments
Material requisition
Purchase requisition
Purchase order
None of these
200 practice sets · Page 3 of 10
Which of the following is used for issuing materials to different production departments
Material requisition
Purchase requisition
Purchase order
None of these
Which of the following is not a characteristic of intermittent production system?
The flow of production is intermittent
The volume of production is generally small
A single product is manufactured in bulk
None of these
Which one of the following is not an objective of materials management?
To maximise material cost
To purchase receive transport and store materials efficiently
To reduce material costs through simplification standardisation
To minimise material cost
...............is the part of an organization that produces the organizations physical goods and services.
Operating system
Marketing system
Financial system
all of these
Which of the following is not a principles of TQM?
Customer focus
Continuous improvement
Team approach
Producer focus
...............deals with decision-making related to production processes so that the resulting goods or services are produced according to specifications, in the amount and by the schedule demanded and out of minimum cost.
Production management
Marketing management
Financemanagement
Capital structure
Which of the following is not an objective of quality circle?
To improve quality
To improve productivity
Employee retrenchment
none of these
...............is the application or techniques designed to establish the time for a qualified worker to carry out a specified job at a defined level or performance
Work measurement
Work delay
Work atmosphere
None of these
Dispatch provides official authorization for
Movement of materials to different work stations
Movement of tools and fixtures necessary for each operation
beginning of work on each operation
all of these
...............is a process used to determine the maintenance requirements of any physical asset in its operating context?
Reliability Centered Maintenance
Preventive cost
Unavoidable cost
None of these
...............is the degree to which the design specifications for a product or service are appropriate to its function and use, and the degree to which a product or service conforms to its design specifications
Quantity
Quality
Price
Cost
...............is the art and science of ensuring that all which occurs is in accordance with the rules established and the instructions issued
Operational plan
Operational policy
Operational mission
Operational control
...............is the process of creating and using mathematical representations of management problems and organizations to predict outcomes of proposed courses of action
Mathematical modelling
Physical modelling
Service queries
none of these
...............is concerned with planning the details of the methods required to perform each operation
Factory Planning
Process Planning
Operation Planning
None of these
In ............... the operations are located and the sequence of these operations in the production is determined
Factory Planning
Process Planning
Operation Planning
None of these
...............is the Japanese concept of continuous improvement in all things.
Kaizen
Marketing myopia
a and b
None of these
Which of the following is a ProductionPlanning?
Factory Planning
Process Planning
Operation Planning
all of these
...............is a Manufacturing systems utilizing computer software programs that control the actual machine on the shop floor.
complex manufacturing
Computer aided manufacturing
a and b
None of these
Which of the following is not atechnique of work measurement
Time study
Amalgamation
Work sampling
Predetermined motion and time study
...............is a process of representing each item by a number, the digit of which indicates the group, the sub-group, the type and the dimension of the item.
Codification
Classification
Duplication
None of these