ObjectiveMcq
Print Protected
This page is protected for print. Use the website to view the content.
If the instruction Add RRR3 is executed in a system which is pipelined, then the value of S is (Where S is term of the Basic performance equation).
Correct Answer: C — ~1
The value will be much lower in case of multiple BUS organisation.